Important Role of Consultants and Contractors with their Responsibilities

In planning and Execution of work, The Architect has also fulfills Government formalities before Commencement (Raja Chithi), He also co-ordinate with various agencies. As same Structure designer play his role perfect for Structural portion. Understand with their responsible points :

è Architect –

-          Understand Requirement from the client / Builder

-          Prepare Initial Sketches or Drawing for that

-          Guideline for Brochures

-          Prepare Drawing and permit from Municipal Corporation as per Bye-Laws

-          Submit Plans for NOC Clearance – Drainage Department, Road Department and Other Department

-          Detail Drawing with Specifications and dimensions for Sanction by Municipal Corporation

-          Physical cross check at site in regular basis

-          Prepare Calculations for Taxes, Fees and Charges of Government

-          Suggest Material Specification

-          Settle the dispute bills of Contractors

-          Meetings with Government Authorities, Contractors and Agencies for work

-          Prepare the Model Building of the Project

-          Give Amenities Drawing of project



è Structural Designer –

-          Workout RCC design based Strata and Architectural Drawing

-          Checking of Strata of Footing, Reinforcement, Visit to the Site, Quality of the Concrete, Estimate of require Structure Steel and RCC Work

-          Inspection of the trial pit for check Strata

-          Checking Strata for footing pits basement before laying foundation PCC

-          Checking Reinforcement at every stages of RCC work

-          Checking footing concreting

-          Precautionary measures for work near existing structure

-          Checking Plinth Filling before floor PCC work

-          Inspection of any damage work

-          Inspection of Expansion Joints

-          Critical Structures –

Lift Shaft bottom slab

Machine Foundation

Slab on Nalla and Culverts

Staircase and Ladders

Decorative Towers, RCC Grills and Floating Columns

Light Weight Masonry

Water proofing of structures

Expansion Joints


è Plumbing Consultant –

-          Water supply system

-          Internal pipe fittings

-          Plumbing and sanitary work

-          Drainage disposal layout

-          Strom Water

-          Drain details

-          Septic Tank

-          Underground Water Tank

-          Overhead water Tank

-          Boosting system details

-          Fire Fighting System Implements

-          Materials – GI, CI, PVC, uPVC, cPVC pipes and Its fittings with Solutions

-          Solve and Repairing work / Leakages and seepage works

-          Pump details

-          Swimming pool water supplying and outlet system

-          Check Pressure after done rough work of piping in Unit

-          NOC Should be Issued by the plumbing consultant at Stages of works-

Plinth and Parking Levels

Strom Water and Drainage arrangements

Sewer line to laid in and out side of project

Conceal Piping work as per stages of construction – Floors and Plaster

Ground Drainage network and All Main hole chambers connections

Invert level of Septic Tank and Soak pit

Terrace Piping work

Overhead water Tank inlet and outlet

Underground Water Tank piping work

                                                                              

è Electrical Consultant –

-          Submit the layout drawing of electrical cable distribution system

-          Study of require load 3 Phase

-          Main line – Transformer – Feeder Pillars – Switch Gear – Bus bar – Meter

-          Distribution of power supply

-          Earthling work (GI 1” Patty)

-          Cross check after done meter fittings – Unit wise


è Road Work Consultant –

-          Mark Roads

-          Types of Road depending on Strata, Geography and Soil of land

-          Check Road level with Dumpy Level and Staff

-          Section Drawing of road with details

-          Details of Rain water gutter or trenches, Drainage Mainholes with Its Covers, Inspection Chambers, Strom Water Drains,

-          Proper slops of roads

-          Mark location of trees and Electric poles along with road

-          Give NOC for the following work of road –

Layout

All underground conducts and Drainage lines

Filling, Compaction, Level, Thickness and Slopes of the road



è Water Proofing Consultant –

-          Decide Type of Water Proofing for Various work in construction

-          Water proofing for expansion joints

-          Check Physically at site

-          After Base coat – Spout fixing and grouting

-          After laying Brickbat coba before final finishing

-          Final testing of flooring by water



è Land Scape Consultant –

-          Plan for landscaping work

-          Stage of work for gardening and plantation according to the project

-          Drawing of Play Ground and Its Equipment, Types of Trees, Sand Pits

-          Estimate for Landscaping

-          Lawns and plants in garden

-          Appoint Gardeners for protect plantation and proper grow

-          Water Supply arrangement for watering in the Landscape areas

-          Pumping System and Its Electric connection

-          Provision of Draining water and Fountains

-          Design for Fountain and Estimate and Maintenance



è Swimming pool Consultant –

-          Specify Size and Capacity of Swimming pool

-          Water Supply Provision

-          Water Outlet Provision

-          Electricity arrangement

-          Filtration Plant

-          Drainage Arrangement

-          Plumbing work

-          Construction Details of Swimming pool

-          Purify Water / Re use water for Swimming pool

-          Protective Fencing surrounding the swimming pool

-          Changing room, Bathing place, water sports and Swimming shout